Go back to MB6-291 - Microsoft Business Solutions - Axapta 3.0 Shop Floor Control

Question :-

In a pay agreement it is possible to make each line dependent on an operation. However, the following has to be met as a minimum:
Axapta has to be installed as a minimum with Production II, route management
Axapta has to be installed with Production III, shop management
The operation must be of the job type 'process job'
Piecework must be setup for this operation

Want to practice for MB6-291 - Microsoft Business Solutions - Axapta 3.0 Shop Floor Control ? Click here.