MB3-234 - Microsoft Business Solutions - Great Plains 8.0 Manufacturing Applications

Go back to Microsoft

Example Questions

Which of the following is a routing status type? Which of the following is true about Quality Assurance? Which statement is correct regarding adjustments made to work centers? When do you use the Supplier Corrective Action Request window? Which of the following is true of the Revision History window? The start and end times for a sequence are determined by the entries you make in the Routing Sequence Entry window. Which of the following formulas is used? Which of the following cost buckets can be chosen to reflect the outsourcing costs for a Manufacturing Order? Sales forecasting plans have been set up with the Forecast Period, Forecast Start Date and Issue To Site as Plan 1 = 1 Month, July 1, WAREHOUSE; Plan 2 = 1 Month, July 1, NORTH; Plan 3 = 1 Month, July 1, WAREHOUSE; and Plan 4 = 1 Week, July 1, WAREHOUSE. In the sales forecast combination window, if the template plan is Plan 1, which of the other three plans will the user be able to combine with Plan 1, if all plans have the same Forecast End Date? Which status below is NOT valid in the Manufacturing Order Entry window? Where is preliminary inspection information entered? In order to combine sales forecasts, which condition must be met? The Machine Variable Overhead cost bucket is chosen to capture outsourcing costs. Assuming a setup of Outsourced Routing sequence, Outsourced Machine Variable Cost, MO Start Quantity, and Previous Routing Sequence WIP Output as Machine time 2.00000, $10.00/piece, 20 items, and 5, what will be the cost of the purchase order? Manufacturing Orders can be created by, or within, all of the following processes except? What is the purpose of the QA User Preferences window? Capacity Requirements Planning allows you to forecast which of the following? Which term is best described as a lack of resources to produce the required amount of an item to fill outstanding orders? When setting up a new actual cost finished good item, which of the following accounts should be set up if both material and labor data will be collected for the item? Which statement(s) below are correct regarding MRP? What is the purpose of the Manufacturing Order Variance window? What is the standard material cost for Item A given the item has the bill of material (BOM) structure set up with the components, Qty Per, and standard costs as Item X, 5, $5.00 and Item Y, 1, $2.50? What is the valuation method for actual cost items? Assuming the projected available balance for a make item is 3 and a sales order for this item has been entered for a quantity of 10. The net requirement in the MRP Workbench will show which quantity? Which of the following actions can be performed in the Component Transaction Entry window? Items and/or Sites can be excluded in MRP by selecting settings in which of the following windows? In the Adjust Forecast Quantity window, which of the following are possible? The markdown amounts in the Sales Configurator window for a configured bill of material can be adjusted only if the status of the manufacturing order that is based on the BOM has which of the following status? Which setup items are required to be completed before data will be entered in the CRP View tables? Which statement is correct regarding the Purchases Account for service item for this Outsourced PO? Which of the following statements defines the Scrap action as it occurs on the Component Transaction Entry window? What is the purpose of the BOM Security window? The lead time offset for materials on the BOM can be calculated from which of the following dates? This formula best calculates which MRP quantity below equired Firm + Required Planned? If work in process (WIP) is not used to enter information about the amount of labor or machine time used for the sequence, what selection(s) need to be marked in the Routing sequence entry screen? Which statement best describes Low Level Codes? In manufacturing job costing, how is an "element" defined? In the standard cost changes window, the user may make standard cost changes to individual items. In that window, there are two selections for roll up scope, Only the Selected Item and All Changed Items. What is the difference? Sales Configurator is designed to function with items that use what type of costing/valuation method? Which statement is true regarding the Auto Apply checkbox in the Job Transaction List Setup Window? Which item below is a Job Costing "element"? Which of the following best describes the back flushing option on the Bill of Material? What is the purpose of the percent bucket located on the super bill of material? Which of the following statements are true regarding ECM warnings? CRP Released View for employee and machine in the CRP View Window includes which of the following manufacturing orders? Where can MRP get the lead-time for a bought item? Which of the following transactions can be linked to multiple jobs? Which of the following is the only MRP Planning Method available? How are by-products designated on a bill of material? A sales forecast has been created for Item 1 (a finished good item) with Forecast period = 1 month, Forecast start date = July 1, and Forecast quantity as July 1 = 30 and August 1 = 40. The sales forecast has been set up to be seen by material requirements planning (MRP), with a demand fence of 2 periods. The MRP run date is June 20. There are no orders for Item 1, and the on hand amount is zero (it is out of stock). What is the result of the MRP run? Before using outsourcing, what setup is required? The Machine Variable Overhead cost bucket is chosen to capture outsourcing costs. Assuming a setup of Outsourced Routing sequence, Outsourced Machine Variable Cost, MO Start Quantity, and Previous Routing Sequence WIP Output as Machine time 2.00000, $10.00/piece, 20 items, and 5, what will be the quantity to order on the purchase order?