Example Questions

What are characteristics of repetitive manufacturing? (Choose three) When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three) What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three) What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two) Where in the SAP ECC system can you define production versions? Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three) You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence. What do you have to consider in this scenario? A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists. What do you have to consider for the two lists at this stage? (Choose two) The availability check during production order creation should use a different scope of check than during order release. How can you fulfill this requirement? You select the master data for production orders via production versions. Which information is contained in a production version? Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing? You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directly Which standard SAP material type do you use? Which of the following statements best defines SAP ERP? When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two) In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data: - Start: 7:00:00 a.m. - End:3:00:00 p.m. - Break duration: 1 hour - Rate of utilization: 80% - Overload:110% - Number of individual capacities: 1 How large is the standard available capacity? What data can be posted directly via the Plant Data Collection (PP-PDC) interface? What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three) What do you have to consider regarding lot size procedures? Which option for selecting a routing exists when you create a production order? The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order. However, a corresponding rescheduling exception message does not appear. What could be the reasons? (Choose two) Which Customizing element controls the determination of planned costs in production orders? Which activity can trigger an automatic availability check for the components of a production order? Which property applies for consumption with planning strategy 40 (planning with final assembly)? Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order. Which BOM item category must you set to fulfill this requirement? In what sequence are the steps of material requirements planning performed in SAP ECC? Which function is supported by production orders? You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40. Which sequence category do you use to create the second sequence in the system? What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two) During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the following procurement type properties are valid? (Choose two) You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan. Which of the following scenarios are applicable in this case? (Choose two) When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective? What do you have to consider regarding consumption? (Choose two) An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG). What is the easiest way to fulfill this requirement? Which of the following master data can be used with process orders? (Choose three) Which of the following features are offered by MRP areas in SAP ECC? (Choose two) In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type. What does a firming type define? (Choose two) Which of the following requirements is supported by using process orders? Which of the following master data is necessary for the creation of material reservations for production orders? Which activities lead to a reduction of the capacity requirements for an operation? (Choose three) What can you use to organize material staging for production orders? (Choose three) You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be the reason? What sequence do you follow in master data maintenance to define the production of a material? You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead- time scheduling). Which of the following properties for the resulting dependent requirements applies? Which of the following properties about the planning functions available in SAP ECC applies? Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt? What functions can you use for suboperations? (Choose two) What master data do you need for material replenishment using the KANBAN procedure? (Choose two) What could be a consequence of confirming an operation? Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master. How is the resulting firming interval specified in this scenario? Where can you define the valid receivers for production order costs?