C_TSCM42_65 - SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5

Go back to SAP

Example Questions

What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three) Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order. Which BOM item category must you set to fulfill this requirement? Which of the following features are offered by MRP areas in SAP ECC? (Choose two) In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type. What does a firming type define? (Choose two) What functions can you use for suboperations? (Choose two) Which of the following statements regarding ATP checks in SAP ECC that are triggered from customer orders is correct? Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing? Where can you define the valid receivers for production order costs? An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon. What procedure do you recommend for setting the planning horizon? Which of the following statements regarding lot size procedures is correct? Which Customizing element controls the determination of planned costs in production orders? In which of the following objects can you activate backflushing for production orders? (Choose three) What sequence do you follow in master data maintenance to define the production of a material? In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data: - Start: 7:00:00 a.m. - End: 3:00:00 p.m. - Break duration: 1 hour - Rate of utilization: 80% - Overload: 110% - Number of individual capacities: 1 How large is the standard available capacity? You want to enhance the system statuses of a production order with user statuses. How do you do this? Which of the following statements about the planning functions available in SAP ECC is correct? Which property applies for consumption with planning strategy 40 (planning with final assembly)? Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released? Which properties does ECC Master Production Scheduling (MPS) have? (Choose three) During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the following procurement type properties are valid? (Choose two) Which statements regarding SAP ECC long-term planning (LTP) are correct? (Choose two) What could be a consequence of the confirmation of an operation? What option for selecting a routing exists when creating a production order? You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be the reason? You select the master data for production orders via production versions. Which information is contained in a production version? Which activity can trigger an automatic availability check for the components of a production order? Which of the following consequences result when a production order is set to Technically Complete (TECO)? (Choose three) Which activities lead to a reduction of the capacity requirements for an operation? (Choose three) You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-specific actual data from an external process control system to SAP ECC. How can you fulfill this requirement? The final assembly of a finished product should only be triggered when a customer order arrives. Which planning strategy for the finished product do you use? When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three) Where can you define the default storage location for the material component of a production order? (Choose three) Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three) What data can be posted directly via the Plant Data Collection (PP-PDC) interface? You maintained the planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months you have planned requirements with requirement type LSF (derived from the main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan. Which of the following statements are applicable in this case? (Choose two) What is a feature of the simu-lation mode for material requirements planning in SAP ECC? Which master data is necessary for the creation of material reservations for production orders? Which of the following master data can be used with process orders? (Choose three) Which objects can affect the calculation of capacity requirements for an operation? (Choose three) Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt? You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning procedures? You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC. On which specifications is the dynamic safety stock calculation based? Which of the following properties applies to multi-site planning in SAP ECC? An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG). What is the easiest way to fulfill this requirement? Which functions can be triggered before releasing a production order? (Choose three) Which of the following efforts can be minimized using the KANBAN procedure? Which of the following scheduling types can only be used within capacity planning? In which master data object do you set the standard values for an operation? You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you should be able to use a second sequence on other work centers for operations 30 and 40. What sequence category do you use to create the second sequence in the system? Where in the SAP ECC system can you define production versions?