PMI CAPM - Certified Associate in Project Management

Go back to PMI - Project Management Institute

Example Questions

Organizations perceive risks as: Which Control Quality tool is also known as an arrow diagram? Which type of contract is a hybrid of both a cost-reimbursable and a fixed-price contract? Project contracts generally fall into which of the following three broad categories? Which process develops options and actions to enhance opportunities and reduce threats to project objectives? Which tool or technique is used in Manage Stakeholder Expectations? Which grid shows which resources are tied to work packages? The output that defines an approach to increase the support and minimize negative impacts of stakeholders is the: What type of planning is used where the work to be accomplished in the near term is planned in detail, while work in the future is planned at a higher level? Which is one of the major outputs of Sequence Activities? An input of the Plan Procurement Management process is: Which tool or technique is used to develop the human resource management plan? Perform Integrated Change Control is the process of: A complete set of concepts, terms, and activities that make up an area of specialization is known as: Power, urgency, and legitimacy are attributes of which stakeholder classification model? Quality metrics are an output of which process? Which project document is updated in the Control Stakeholder Engagement process? Who determines which dependencies are mandatory during the Sequence Activities process? A project has a current cost performance index (CPI) of 1.25. To date, US$10,000 have been spent on performing the project work. What is the earned value of the work completed to date? Which group is formally chartered and responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project and for recording and communicating decisions? The iterative and interactive nature of the Process Groups creates the need for the processes in which Knowledge Area? Risk categorization is a tool or technique used in which process? In which Knowledge Area is the project charter developed? Which type of diagram includes groups of information and shows relationships between factors, causes, and objectives? A purchase order for a specified item to be delivered by a specified date for a specified price is the simplest form of what type of contract? A risk that arises as a direct result of implementing a risk response is called a: After Define Activities and Sequence Activities, the next process is: Which of the following strategic considerations often results in project authorization? A project lifecycle is defined as: Which process determines the risks that may affect the project and documents their characteristics? Which Process Group contains those processes performed to define a new project? What is the number of stakeholders, if the project has 28 potential communication channels? Which of the following reduces the probability of potential consequences of project risk events? Units of measure, level of precision, level of accuracy, control thresholds, and rules of performance measurement are examples of items that are established in the: Which process is included in the Project Integration Management Knowledge Area? Which is an example of Administer Procurements? Prioritizing risks for further analysis or action by assessing and combining their probability of occurrence and impact takes place in which process? Which activity may occur at project or phase closure? The zero duration of milestones in project planning occurs because milestones: A required input for Create WBS is a project: The key benefit of the Monitoring and Controlling Process Group is the ability to: The process of confirming human resource availability and obtaining the team necessary to complete project activities is known as: Types of internal failure costs include: Which conflict resolution technique searches for solutions that bring some degree of satisfaction to all parties in order to temporarily or partially resolve the conflict? Which of the Perform Quality Assurance tools and techniques may enhance the creation of the work breakdown structure (VVBS) to give structure to the decomposition of the scope? Which of the following documents allows the project manager to assess risks that may require near term action? Who, along with the project manager, is supposed to direct the performance of the planned project activities and manage the various technical and organizational interfaces that exist within the project? Which output of Project Cost Management consists of quantitative assessments of the probable costs required to complete project work? Who is responsible for initiating a project? Which changes occur in risk and uncertainty as well as the cost of changes as the life cycle of a typical project progresses?

Study Guides